Construction Daily Log Generator

Optional. Attach a photo, set a due date, and mark items closed as they are fixed.

Result

Fill in the form and press Generate log. The formatted report appears here.

Open punch items

No open items.

Saved records

How it works, and what to write

What this does

A daily log is the running record of what happened on a site: who was there, what was built, what materials and plant were on site, what went wrong, and what weather you were working in. Contractors call it a daily report or a contractor's daily report (CDR); in the UK, Ireland and Australia the same document is a site diary. Inspectors and clerks of works keep a parallel version, usually an inspector's daily report (IDR).

This page fills in the fields, formats them into the standard four-part structure, and lets you copy, print or download the result. Records are saved in your browser only — nothing is uploaded.

Why the record is worth keeping

A daily log is not paperwork for its own sake. When a delay claim, a defect dispute or a payment argument lands months later, the only evidence of what actually happened on a given Tuesday is the log written that Tuesday. Records that name the weather, the crew size and the exact work area are the ones that survive scrutiny; a line saying "work continued" does not.

Two conventions are worth knowing. In the United States, unfinished or defective work is tracked on a punch list. In the UK and Ireland the same list is a snagging list, in Australia it is often a defects list. Whatever you call it, the useful part is the same: every item has a description, a due date, and a status that changes from open to closed when it is fixed.

What to write in each section

Work performed. Quantities and locations, not adjectives. "Poured 18 m³ to the north slab, levels 2–3" can be checked later; "good progress" cannot.

Labor, materials and equipment. Headcount by trade, deliveries received, and plant on site. This is what backs up a day-rate claim or a delivery dispute.

Quality and safety. Anything you would want a photograph of. Attach the photo, set a due date, and close the item when it is resolved. Items past their due date appear under Open punch items so they do not quietly disappear.

Other items. Inspections, meetings, visits, and delays with their cause. If the crane was down for four hours because of high wind, that belongs here — it is the difference between a weather delay and a productivity problem.

About the output

Print / Save as PDF uses your browser's own print dialog, which is the most reliable way to produce a signed copy. Download .html gives you a standalone file you can reopen in any browser or paste into Word or Google Docs. Dates are written as YYYY-MM-DD on purpose: 05/11 means 5 November to one half of the industry and 11 May to the other, and a log is the last place to be ambiguous about a date.

Records and photographs stay on this device, in your browser's own storage, and are never uploaded. Clearing site data in your browser deletes them. Formal logs still need to be reviewed and signed by the person responsible on site before they are filed.

Questions

What is a daily construction report?

It is the record a contractor keeps for each working day on site: the work carried out, the labor, materials and equipment present, the weather, and any quality or safety issues. In the US it is usually called a daily report or contractor's daily report (CDR). The same document is a site diary in the UK, Ireland and Australia.

What is the difference between a punch list and a snag list?

They are the same thing under two names. A punch list (US) or snagging list (UK and Ireland) is the list of defective or incomplete items that must be fixed before handover. Australia tends to call it a defects list. Each item carries a description, a due date and an open or closed status.

Who should fill in a site diary?

Whoever is running the site that day: the site manager, foreman, or general foreman. On inspected works the inspector or clerk of works keeps a separate record, which is why this page offers both a contractor's report and an inspector's report.

How long should daily logs be kept?

Long enough to outlive the defect liability period, which is commonly 12 months after practical completion and can be longer by contract. Because logs are the contemporaneous evidence in delay and defect disputes, many firms keep them for the life of the project plus the limitation period for claims in their jurisdiction.

Is the weather really necessary?

Yes. Temperature and precipitation decide whether concrete can be placed, whether coatings cure, and whether a delay counts as weather. A log without weather is thin evidence when a claim depends on it.

Does this upload my project details or photos?

No. Everything runs in your browser. Saved records and photographs are stored in your browser's own IndexedDB storage on this device, and are not sent to any server. Clearing your browser data for this site removes them.

Can I edit a saved record?

Yes. Press Load next to any saved record and the form refills with it, including the punch list items and their photographs. Edit what you need and generate again.

Why are dates written as 2026-11-05?

Because 05/11 is read as 5 November in the UK and 11 May in the US. ISO format (YYYY-MM-DD) reads the same way everywhere, which matters on a document that may be used as evidence. You can reformat it after download if your office uses a local convention.