How Much Gravel Do I Need for a Driveway?

Gravel driveways fail for one of two reasons: not enough stone, or the right amount of stone in the wrong layers. The first is arithmetic. The second is the one that costs you the weekend.

Most people start by measuring the area. That is the wrong order, because area is fixed by the site and depth is not. On the same 700 square foot driveway, two inches and six inches of stone are a factor of three apart in material, and only one of those depths will hold a truck.

Decide the total depth first

Use Total depth Typical build-up
Footpath, occasional light car 2 to 3 in Single layer, #57 or pea gravel
Residential driveway, cars and SUVs 6 to 7 in 4 in base + 2 to 3 in surface
Driveway with pickups or a trailer 8 in 5 to 6 in base + 2 to 3 in surface
Farm track, heavy or tracked vehicles 10 to 12 in 8 in base + 3 to 4 in surface

Two layers, not one thick one

This is the point that separates a driveway that lasts from a pile of stone that keeps moving. The two layers are different materials doing different jobs, and neither one substitutes for the other.

The base is crusher run, also sold as #304, MOT Type 1 or 3/4 minus. It contains stone dust and fine particles along with the coarse aggregate, which means it compacts into something that behaves almost like weak concrete. It is the structural layer. Water drains through it slowly, and that is fine, because it is not the surface.

The surface is a clean single-size stone, usually #57, #411 or 20 mm clean. “Clean” means washed, with the fines removed. It does not compact into a solid mass, it locks by particle interlock and sits on top of the base as a running surface. Because there are no fines to turn to mud, it stays workable in rain.

Use only clean stone and the drive ruts, because single-size aggregate has nothing to bind it. Use only crusher run and the surface stays loose and dusty, tracks into the garage, and turns to slurry at the first downpour. You need both.

How much of each

Layer Depth Material Density
Base 4 to 6 in Crusher run / #304 / Type 1 1.45 to 1.55 tons per cu yd
Surface 2 to 3 in #57 / #411 / 20 mm clean 1.35 to 1.45 tons per cu yd

Those densities are for loose material as delivered. They matter because stone is sold by weight and laid by volume, and the two only line up if you know the conversion.

From square feet to cubic yards to tons

Three steps, in this order:

  1. Volume in cubic feet = area in square feet x depth in feet. A 4 inch layer is 0.333 ft.
  2. Cubic yards = cubic feet divided by 27.
  3. Tons = cubic yards x density from the table above.

A worked number to anchor it: 1 cubic yard spread 1 inch thick covers 324 square feet. That single relationship answers most driveway questions faster than any formula, because you can divide your area by 324 and multiply by the depth in inches.

The 25 percent you lose to compaction

Stone does not arrive at its final thickness. A 6 inch lift of crusher run compacted properly finishes at about 4.5 to 5 inches. That means the depth you calculate is the depth you want after compaction, and the quantity you order has to be larger.

Material Order this much more Why
Crusher run / #304 25 to 30% Compacts into a dense mass, loses volume
#57 / clean stone 5 to 10% Settles and knits, but does not compact

This is the single most common reason a driveway comes up short. Someone calculates 14 cubic yards, orders 14, spreads it, compacts, and ends up an inch thin across the whole drive. Order 18 and you will have a small pile left over, which is exactly where you want to be.

Geotextile: the cheapest inch you can buy

A woven or non-woven geotextile laid between the subgrade and the base is not decorative. It stops two things that ruin gravel drives: the fine soil particles pumping up into the stone, and the stone punching down into soft ground. Either one turns a graded base into a mud bath over a couple of seasons.

It costs roughly $0.25 to $0.45 per square foot, and in soft ground it lets you reduce the base by about two inches. On clay, silt, or a site that was a garden last year, use it. On already-compacted gravel or sand, it is optional and you can put the money into depth instead.

Worked example: a 24 by 30 driveway

720 square feet, cars and a half-ton pickup, so 5 inches of base and 2.5 inches of surface.

Step Base, crusher run Surface, #57
Volume at finished depth 720 x 5/12 = 300 cu ft 720 x 2.5/12 = 150 cu ft
Cubic yards 11.1 cu yd 5.6 cu yd
Compaction allowance x 1.28 = 14.2 cu yd x 1.08 = 6.0 cu yd
Tons to order about 21.5 tons about 8.5 tons

Roughly 30 tons total, or 20 cubic yards, at $28 to $38 per ton delivered depending on region and haul distance. That is $840 to $1,150 in material for the driveway, before any excavation or edging.

The gravel calculator runs the same arithmetic for any footprint and depth, and returns cubic yards, tons and cost so you can compare suppliers who quote in different units. If the driveway needs a concrete apron or a pad at the garage, the concrete cost calculator prices that separately.

Four mistakes that waste a load

  • One thick layer instead of two thin ones. A single 8 inch layer of clean stone will rut no matter how well you spread it, because there is no graded base underneath to lock it.
  • Not compacting in lifts. A plate compactor only reaches about 4 inches. Spreading 8 inches and running over the top leaves the bottom half loose, and it settles for years.
  • No edge restraint. Gravel has no tensile strength, so the edges spread outward under load until the drive is thin at the borders. Steel edging, timber, or a 45 degree shoulder all work; doing nothing does not.
  • Sloping towards the house. Aim for about 2 percent away from the building. A driveway that ponds against the garage wall will find its way inside, and regrading later costs more than the stone did.

Ordering: by the ton or by the truck

Under about 10 tons, buy by the ton and take it in a small dump trailer or bags. Between 10 and 20 tons, a single-axle dump truck is usually the cheapest delivered unit. Above 20 tons, ask for a tandem or tri-axle and price it per load rather than per ton, because the haul charge dominates at that size.

One practical warning: the driver will not wait while you move a wheelbarrow. Decide where the pile goes before the truck arrives, and if the driveway is long, ask for it to be dropped in two piles rather than one. Spreading 30 tons by hand from a single pile at the road end is a two-day job; from two piles it is one.

If your numbers are close to a truck boundary, round up. Leftover stone is useful for potholes and drainage. Being a ton short means a second delivery charge that costs more than the extra stone would have.

Turn your depth into a quantity

Enter the area and both layer depths, and the gravel calculator returns cubic yards, tons and cost.