How Much Concrete Per Fence Post? (Bag Counts + Chart)

A 6 ft fence with 4×4 posts set in 12 inch holes needs about 2.1 cubic feet of concrete per post. That is four 80 lb bags, or five 60 lb bags.

Twenty posts comes to 42 cubic feet, which is 1.56 cubic yards and 71 bags of the 80 lb size. Buy a few extra. Concrete is cheap compared to a second trip.

Those two numbers are the answer most people want, and they are the answer for one specific hole. Change the diameter, the depth, or the post size and the count moves. Here is what actually drives it, and where the common estimates go wrong.

Three inputs decide the number

The volume of concrete in a post hole is the volume of the hole minus the volume of the post sitting in it. Everything else is detail. So you need three measurements before any arithmetic means anything:

  • Hole diameter, usually 10 or 12 inches for a wood fence
  • Depth, which is set by your climate more than by your fence
  • Post size, the one people forget

On that last point: a 4×4 is not 4 inches square. It measures 3½ by 3½ inches, and a 6×6 measures 5½ by 5½. The difference sounds trivial until you multiply it by twenty holes. Use actual dimensions, not the name on the lumber rack.

How deep the hole has to be

Three rules apply at the same time, and you take the deepest one.

A third of the post’s total length

This is the baseline. It applies to the whole post, not to the fence height above ground. A 6 ft fence wants a 9 ft post with 3 ft buried, because 36 out of 108 inches is exactly a third.

Never less than 24 inches

At 4 ft and below, a third of the post works out to less than two feet, and the floor takes over. A shallow hole gives the post nothing to lever against.

Below the frost line, plus about 6 inches

If your ground freezes in winter, this rule wins and it is not close. Water in soil expands as it freezes. A footing sitting inside that freezing zone gets nudged upward a little every winter, and it does not settle back to where it was. After three or four seasons the post is visibly out of plumb and the fence line looks wavy. More concrete will not fix it, because the ground is lifting the whole assembly.

The frost depth for your area is published by your municipal building department. It is not a national number and it is not worth estimating from a map, because two neighbouring counties can differ by a foot. One phone call gets it, and it overrides every rule of thumb on this page.

How wide

Three times the post width is the standard. For a 4×4 that is 3 × 3½ = 10½ inches, and the nearest size auger bit is 12. The concrete collar around the post is what resists wind pushing on the panels, so a hole barely wider than the post leaves you with nothing to backfill against.

Concrete per post

Numbers below are net volume, meaning the hole minus the post, for a 4×4. Bag yields are from the Quikrete concrete mix data sheet: an 80 lb bag yields 0.60 ft³ and a 60 lb bag yields 0.45 ft³.

Hole diameter Depth Concrete (ft³) 80 lb bags 60 lb bags
10 in 24 in 0.92 2 3
10 in 30 in 1.15 2 3
10 in 36 in 1.38 3 4
10 in 42 in 1.61 3 4
12 in 24 in 1.40 3 4
12 in 30 in 1.75 3 4
12 in 36 in 2.10 4 5
12 in 42 in 2.45 5 6

Read the 12 inch rows for a typical privacy fence. At 36 inches deep you are at four 80 lb bags per post. Drop to 24 inches in frost-free ground and it is three. Push to 42 inches for a cold climate and it is five.

Why two calculators give you two different answers

This trips people up, so it is worth being blunt about it. There are two defensible ways to compute the volume.

One fills the entire cylinder. It ignores the fact that a post is standing in the middle of it. The other subtracts the post and returns the annular space, the ring of concrete around the post, which is what you actually pour.

On a single 12 inch hole at 30 inches deep, the first method says 1.96 ft³ and the second says 1.75 ft³. Rounded to bags that is 4 against 3, so the difference hides inside the rounding and nobody notices.

Across twenty holes at 36 inches it stops hiding. Filling the whole hole gives 47 ft³ and 79 bags. Subtracting the post gives 42 ft³ and 71 bags. That is 8 bags, about $44 at $5.50 a bag, for concrete that would have gone into a space occupied by lumber.

Our post hole calculator subtracts the post. Our fence calculator works from the full hole volume, because it is estimating a whole run rather than pricing a single hole. Both are correct for what they do. If you are buying bags, use the one that subtracts.

Two things that quietly shrink the number

The gravel base

Most guidance calls for 4 to 6 inches of coarse gravel tamped into the bottom of the hole so the post end is not sitting in standing water. That gravel is not concrete. A 36 inch hole with 6 inches of gravel gives you a 30 inch concrete column, which is 1.75 ft³ and three 80 lb bags, not 2.10 ft³ and four.

Either dig 6 inches deeper so the post still ends up where you want it, or accept the shorter column. What you should not do is dig 36 inches, add gravel, and then order concrete for 36 inches.

How you finish the top

Do not leave the concrete flat and level with the soil. Water pools in that flat dish and sits against the post at the ground line, which is where posts rot first. Crown it slightly above grade so water sheds away, or stop a few inches below grade and backfill soil over it if you want grass to grow across. Either way that is concrete you are not pouring, and it comes off the top of your number.

Add 5 to 10 percent for waste on top of everything. Spillage, over-excavation in loose soil, and the hole that collapses a little before you get the post in.

The post matters more than the concrete

Concrete around a post that has already rotted through at the ground line is a wasted bag. For any wood in contact with soil, the AWPA use category system is the thing to check. Ground contact requires Use Category 4A or higher, and UC4B is the heavy duty rating that most buried structural posts are sold under. The stamp is on the end of the board.

If you cut a treated post to length, you have exposed untreated wood at the cut. Brush end-grain preservative on it before it goes in the ground. That cut end sitting in the wet is the most common place for a buried post to fail.

Mistakes that cost money

  • Ordering by “two bags a post”. That figure comes from small holes in frost-free ground. In a cold climate with 12 inch holes you need roughly double it.
  • Forgetting the gate posts. Gate and corner posts carry more load and are usually set wider and deeper. They are also the posts you cannot afford to have move.
  • Mixing one hole at a time. Fast-setting mix goes in dry around the post and gets watered in, which is fine for two or three holes. For twenty, a mixer and a standard mix is faster and cheaper per bag.
  • Pulling the braces too early. Concrete that looks set is not cured. Loading the post before it cures locks in whatever lean it picked up.

Get the exact number for your job

The table above covers the common cases. For anything else, put your own hole diameter, depth, post size and waste allowance into the post hole concrete calculator and it will return the net volume and bag count. If you are pricing a whole fence run, the fence calculator works out posts, rails, boards and concrete together. And if you are standing in the aisle deciding between bag sizes, the bag calculator compares them on cost per cubic yard, which is usually not the comparison people expect.