Enter your slab size, or the volume you already know, and this tells you exactly how many bags to buy — plus the total cost, the weight you will be handling, and the volume where it stops making sense to mix bags and you should order a truck instead.
Cubic feet
The two volume boxes are linked. Fill either one.
Per cubic yard, delivered
The flat surcharge plants add to small loads.
| Bag size | Bags | Total cost | Cost per unit |
|---|
A 10x10 slab at 4 inches is 56 bags of 80 lb
That is the number before waste. Add ten percent and it is 62, and most people buy 63 or 64 because being one bag short at the end of a pour costs an hour and a second trip.
The figure behind it is not the weight on the bag — it is the yield, meaning the volume of mixed concrete the bag actually produces. Weight is how it is sold; yield is what you are buying. Divide 27 cubic feet by the yield and you have bags per cubic yard.
| Bag size | Yield | Bags per cubic yard | Bag size | Yield | Bags per cubic metre |
|---|---|---|---|---|---|
| 40 lb | 0.30 ft³ | 90 | 20 kg | 0.0087 m³ | 115 |
| 50 lb | 0.375 ft³ | 72 | 25 kg | 0.0109 m³ | 92 |
| 60 lb | 0.45 ft³ | 60 | 30 kg | 0.0128 m³ | 79 |
| 80 lb | 0.60 ft³ | 45 | 40 kg | 0.0170 m³ | 59 |
Read the bag before trusting the table. Major brands print the yield on the packaging, and it moves with the mix design — a countertop mix and a footing mix of the same weight will not cover the same area. In the UK, Ireland and Australia the 20 kg and 25 kg sizes are the everyday ones; the 40 kg bag exists but is awkward enough that most people buy two small ones.
Where bags stop being cheaper than a truck
Bagged concrete costs roughly two to three times ready-mix per cubic yard. That looks decisive until you remember the short load fee: a flat surcharge plants add when the order is below their minimum. That fee is what makes small jobs different.
material cost of bags = price per bag ÷ yield × 27 (per cubic yard) truck cost = price per yard × volume + short load fee break-even volume = short load fee ÷ (bag cost per yard − ready-mix price per yard)
Take a typical case. An 80 lb bag at $5.50 yields 0.60 ft³, so a cubic yard of bagged concrete costs 45 × $5.50 = $247.50. Against ready-mix at $140 per yard plus a $90 short load fee, the break-even lands at about 0.83 cubic yards. Below that, bags win on money. Above it the truck wins, and the gap widens quickly.
The calculation leaves out your time, and it should not. Mixing a cubic yard by hand or in a small drum takes two to three hours of real labour plus cleanup. Price that labour in and the break-even drops sharply, often below half a yard. Most people find the practical switch-over sits around 1 cubic yard, and the physical switch-over — the point where mixing stops being any fun — arrives noticeably earlier than that.
Three ways the bag count goes wrong
- Bags have a shelf life. Opened or damp bags harden in the sack. Buy a little over, keep the spares dry, and do not stockpile for years.
- Batching too much at once. Concrete that has started to stiffen should not be re-tempered with more water. If you cannot place a batch inside about 30 minutes, mix fewer bags at a time instead of more.
- Ordering to the exact number. The count is a floor, not a target. Uneven subgrade, form spread and spillage all eat real volume, which is what the waste factor is for.
Yield figures are typical values for general-purpose mixes as published by the Portland Cement Association; high-strength and fast-setting blends are usually denser and yield slightly less. Check the bag.
FAQ
How many 80 lb bags for a 10x10 slab?
At 4 inches thick the slab is 1.23 cubic yards, which is 56 bags of 80 lb before waste. Add 10% and buy 62; most people go to 63 or 64 so they are not one short at the end of the pour.
How much area does one bag cover?
An 80 lb bag yields 0.60 cubic feet, so it covers 1.8 square feet at 4 inches thick, or 2.4 square feet at 3 inches. A 25 kg bag yields 0.0109 m³, covering about 0.22 square metres at 50 mm thick.
How many bags are in a cubic yard?
45 of 80 lb, 60 of 60 lb, 72 of 50 lb and 90 of 40 lb. Per cubic metre it is 59 of 40 kg, 79 of 30 kg, 92 of 25 kg and 115 of 20 kg. Divide 27 cubic feet — or one cubic metre — by the bag's stated yield to check any size.
Is bagged concrete stronger than ready-mix?
Not inherently. Both are normally specified at 3000 to 4000 psi for residential work. Ready-mix is more consistent because it is batched by weight under control; bagged concrete varies with how much water you add, which is the single biggest cause of weak home-mixed concrete.
When should I switch from bags to ready-mix?
On money, usually around 0.8 to 1 cubic yard, depending on the short load fee and local prices. On effort, well before that — a cubic yard by hand is two to three hours of mixing plus cleanup. Above about 1.5 cubic yards the truck is the obvious answer either way.
Why does my count differ from the calculator on the bag's website?
Brand calculators often round differently and some assume zero waste. Yield also differs between a standard mix and a fast-setting or high-strength blend of the same weight. If two calculators disagree by more than about 10%, check which yield each one is using.
Can I use bags for a structural footing?
Yes for light structures such as decks, sheds and fences, provided you follow the depth your local frost line requires and use the right reinforcement. For anything carrying significant load, ready-mix with a stated psi and slump is the safer call.
Which bag size is the best value?
Almost always the largest you can comfortably lift, because bigger bags are cheaper per cubic foot. But the 80 lb bag is awkward for one person, and plenty of people move more concrete per hour with 60 lb bags than with 80 lb ones. Handling speed counts.
How much waste should I allow?
Ten percent on a straightforward slab, fifteen if the subgrade is uneven or the shape is awkward. The count the calculator gives you is a minimum, not a target — form spread, spillage and a subgrade that is not perfectly flat all consume real volume.
How long does mixed concrete stay workable?
Roughly 30 minutes in normal conditions, less in hot weather or direct sun. Once it starts to stiffen, do not add water to loosen it — that weakens the mix substantially. Mix smaller batches more often instead.