Size the slab, pick what will be driving on it, and get the yardage plus a cost per square foot broken into materials and labour. Thickness is set from the vehicle type because that is where most driveway slabs are under-built.
Set from the vehicle type above.
Wider apron or turnaround (optional)
Leave at 0 for a plain rectangle. Use it for the flared section near the garage or a parking bay.
Set to 0 if you are doing the work yourself.
Driveways are quoted by the square foot and priced by everything else
The concrete in a residential driveway is typically somewhere around a quarter of the bill. The rest is digging, hauling, forming, finishing and getting rid of whatever was there before. This is why two contractors can look at the same rectangle and come back $3,000 apart, and why the cheap quote is usually the one that skipped the base.
Thickness sits oddly in that picture. Taking the slab from 4 to 6 inches puts 50% more concrete in the ground, but leaves the digging, the forms and the finishing crew exactly where they were. Since the concrete is only about a quarter of the bill, the total rises roughly 12–18% — while the slab gets dramatically harder to crack. It is the best value upgrade on the job.
Thickness by what will park on it
Concrete is strong in compression and weak in bending, so what matters is the point load sitting on top, not the area. All of the figures below assume a properly compacted base; thickness cannot compensate for a soft one.
| What uses it | Thickness | Reinforcement | Notes |
|---|---|---|---|
| Foot traffic, walkways | 4 in | None or mesh | Control joints every 8–10 ft |
| Cars only | 4 in | Mesh | The absolute floor for a driveway |
| Cars, SUVs, pickups | 5 in | Mesh | The usual residential spec |
| Trucks, vans, RVs | 6 in | Rebar grid | Thicken the apron where the weight sits |
| Heavy equipment | 8 in+ | Rebar grid | Design by an engineer, not by rule of thumb |
Where the money goes
| Component | Typical range | What moves it |
|---|---|---|
| Concrete, delivered | $2.00 – $3.50 / ft² | Thickness, local plant prices, short load fees |
| Base preparation and forms | $1.00 – $2.00 / ft² | How much excavation and gravel is needed |
| Reinforcement | $0.30 – $0.80 / ft² | Mesh versus a rebar grid |
| Finishing labour | $2.00 – $4.00 / ft² | Broom finish is cheapest, stamped is not |
| Demolition of the old surface | $1.00 – $3.00 / ft² | Asphalt is cheaper to remove than concrete |
Added up, a straightforward replacement runs $6 to $10 per square foot across most of the US; a first pour on prepared ground can come in lower. Anything past about $12 per square foot usually means awkward access, decorative finishing, or a lot of excavation.
Four details that decide whether it lasts
- Fall, not flat. Aim for about a quarter inch per foot so water leaves the surface. On a wide drive, crown the centre slightly rather than tipping the whole slab one way.
- Control joints, placed on purpose. Concrete will crack; the joints only decide where. Space them at roughly 24 to 30 times the slab thickness in inches — about every 10 ft on a 5 inch slab.
- Isolation joints against the house and garage. The slab must not be bonded to the foundation, or movement in one cracks the other.
- Thicken the apron. The first few feet by the garage and the bay where a heavy vehicle parks take the worst of the load. Thickening just those areas is far cheaper than thickening everything.
Two more things matter more than the slab and neither shows up in the volume: the compacted base under it, and the drainage off it. A 6 inch slab on soft fill fails before a 4 inch slab on well-compacted gravel, and a slab that holds water will spall and crack in a freeze-thaw climate at any thickness.
Thickness and jointing practice follows guidance published by the Portland Cement Association and the American Concrete Institute. Prices are US averages and move with region, access and season.
FAQ
How thick should a concrete driveway be?
Four inches is the floor for cars only. Five inches is the normal residential spec for cars, SUVs and pickups. Six inches with a rebar grid is right if trucks, vans or an RV will use it, and eight inches or more needs an engineer rather than a rule of thumb. None of it helps if the base underneath is not compacted.
How much concrete for a 20x20 driveway?
At 5 inches thick, 400 square feet is 166.7 cubic feet, or 6.17 cubic yards. Order 6.8 to allow 10% waste, and round up to 7 if the plant charges more for a part load than the extra half yard costs — that is a common and avoidable mistake.
What does a concrete driveway cost per square foot?
Expect $6 to $10 per square foot for a straightforward replacement including demolition, and less for a first pour on ground that is already prepared. Concrete itself is typically a quarter of that; labour, excavation and finishing make up the rest.
Do I need rebar, or is wire mesh enough?
Wire mesh is standard for residential driveways and mostly controls cracking rather than adding strength. Rebar earns its money where heavy vehicles sit or park, or where the base is less than ideal. Neither one rescues a poorly compacted base — that is a separate problem and a much bigger one.
How long before I can drive on it?
At least 7 days before a car, and 28 days before parking anything heavy. Concrete reaches most of its strength in the first week but keeps curing for a month, and loading it early is a common cause of hairline cracks that show up later under load.
Should a driveway be sloped?
Yes — about a quarter inch per foot, away from buildings. Flat slabs hold water, which brings staining, spalling in freeze-thaw climates and ice patches in winter. On a wide drive, crown the middle so water sheds to both sides instead of running the full width.
How far apart should control joints be?
Roughly 24 to 30 times the slab thickness, in inches. On a 5 inch slab that is 120 to 150 inches, so about every 10 to 12 feet. The joints do not stop concrete cracking; they decide where the crack happens, which is the whole point.
Why is my quote so much higher than the cost of the concrete?
Because the concrete is typically a quarter of the total. Labour and finishing are usually the largest single line, and excavation, base preparation, formwork and reinforcement account for most of the rest. Comparing quotes on the concrete price alone compares the wrong number.
Is it worth thickening the slab?
Usually yes. Going from 4 to 6 inches puts 50% more concrete in the ground but leaves labour, forms and base unchanged, so the total rises perhaps 12 to 18% while the slab gets far more resistant to cracking. It is one of the cheapest durability upgrades on the whole job.
Related calculators
Figures are estimates for planning. Local prices, bag yields and mix designs vary by supplier and region, so confirm with your ready-mix plant or builders merchant before ordering. Nothing you type is uploaded — every calculation runs in your browser.