The volume is a multiplication. What decides whether the footing survives is how far below grade it sits, and that number comes from your local frost line.
Length is the centreline of the footing, so corners are not counted twice. Width and depth are the finished concrete section, not the trench.
| Line | Quantity | Cost |
|---|
The volume is easy, the depth is not
A continuous footing is a long box, so the concrete is length times width times depth. That part takes ten seconds. What decides whether the footing works is how far below grade its bottom sits, and that number has nothing to do with concrete at all.
In cold climates the ground freezes and expands. A footing placed above the frost line is pushed upward a little every winter, and it does not come back down evenly. The result is a wall that cracks, a door that stops closing, and a repair bill far larger than the concrete saved by digging a shallower trench.
How deep is deep enough
The frost line is a local number, not a national one. It runs from a few inches in the far south to around six feet across the northern states and most of Canada. Local building departments publish it, and inspectors expect the bottom of the footing to sit below it.
A detached structure is sometimes allowed a shallower footing, and a fence post is a different case entirely, but anything tied to a house foundation should follow the local line. If you are unsure, the building department will tell you in one phone call, and that call is cheaper than a re-pour.
Width comes from the wall above it
Footing width is sized to spread the load, so it follows the wall it carries. The textbook case is a 12 inch wide, 6 inch deep footing under an 8 inch foundation wall for a single storey. Each additional storey adds roughly two inches of width, and weaker soil pushes the number up again.
Wider is not automatically better. A footing that is much wider than the wall above it concentrates load at the edges unless the steel is placed correctly, and it costs more concrete for no gain in capacity.
Steel is what makes it a footing rather than a crack filler
Concrete is strong in compression and weak in tension. A footing under a settling wall bends, and the tension appears at the bottom face, which is where the bars belong. Two continuous lengths of #4 near the bottom is the usual minimum for a residential strip footing.
The bars must run continuously through corners and be lapped where they join. A lap is about 40 bar diameters, so 20 inches for #4. The calculator adds 10 percent to the bar length to cover laps, which is enough for a simple rectangular run and not enough for a plan with many corners.
Footing, stem wall, slab: three different pours
People use these words interchangeably and then order the wrong amount of concrete. The footing is the wide strip below grade. The stem wall or foundation wall is the vertical part that rises to floor level. The slab is the floor inside. Each is a separate volume and usually a separate pour.
This calculator counts the footing only. If you are pouring a monolithic slab-and-footing, the geometry is different and the volume will come out higher than this figure.
FAQ
How deep should a concrete footing be?
Deep enough that the bottom sits below the local frost line, which ranges from a few inches in the far south to about six feet in northern states. The concrete section itself is usually 6 to 12 inches thick, but total depth from grade is set by frost, not by the pour.
How wide should a footing be?
Twelve inches under an 8 inch wall is the standard single-storey size. Add roughly two inches per extra storey, and more on weak soil. Local codes tabulate it by wall width, number of floors and soil bearing capacity.
How much concrete does a 40 ft footing need?
A 16 inch wide, 8 inch deep footing 40 feet long takes about 17.8 cubic feet, or 0.66 cubic yards. That is roughly 30 bags of 80 lb mix. At that volume, ready-mix is usually cheaper than bags once you count the mixing time.
Do I need rebar in a footing?
Yes for anything carrying a wall. Two continuous #4 bars near the bottom face control the tension that causes cracking. A footing without steel still holds the wall up, but it cracks across its width and the cracks widen over time.
What is the difference between a footing and a foundation wall?
The footing is the wide strip at the bottom, poured below grade. The foundation or stem wall is the vertical wall that sits on it and rises to floor level. They are usually poured separately because the footing has to cure before formwork goes on top.
Does a fence need a concrete footing?
Fence posts take individual pads or cylindrical pours rather than a continuous strip. Depth still matters, and the same frost rule applies in cold climates. Use the post hole calculator for that geometry.
Can I pour a footing in the rain?
Light rain is survivable if the trench drains. Standing water in the trench changes the water-cement ratio at the bottom of the pour, which is exactly where the steel sits. Pump it out and wait rather than pouring into a puddle.