Measure the area and pick a paver size. This works out how many units you need including cutting waste, plus the sand laying course and the compacted stone base underneath them.
The pavers are the top course. Under them sit a sand laying course and a compacted stone base, and those two layers are usually more material than the pavers themselves.
| Layer | Depth | Volume | Weight | Subtotal |
|---|
A patio is three layers, and the pavers are the thinnest one
Most paving estimates start and end with the pavers, because that is the part you can see and the part sold by the piece. But a paving course is a sandwich: the units sit on a sand laying course, which sits on a compacted stone base, and the two hidden layers are usually more material by volume than the pavers themselves.
┌─────────────────────────────────┐ ← pavers, 2⅜ in / 60 mm ├─────────────────────────────────┤ │ bedding sand, 1 in / 25 mm │ ← a laying course, not a leveller ├─────────────────────────────────┤ │ compacted sub-base, 4 in /100mm│ ← foot traffic │ or 6 in / 150 mm │ ← cars ├─────────────────────────────────┤ │ subgrade │ └─────────────────────────────────┘
Get the top layer right and the bottom two wrong and the surface fails anyway. Pavers are rigid; what they sit on is not.
pavers = round up ( area ÷ ( unit + joint )² × ( 1 + waste ) ) sand = area × bedding depth subbase = area × base depth
The joint is added to each unit before dividing, so a wider joint genuinely reduces the number of pavers you need. It also means more sand to brush into the gaps later.
Waste depends on the pattern, not on the area
Two patios of the same size can need quite different numbers of units, because waste comes from cutting at the edges and the pattern decides how much cutting there is.
| Pattern | Typical waste | Where it suits |
|---|---|---|
| Running bond | 5% | Paths and patios. Cheapest to lay, least cutting. |
| Basketweave | 8% | Patios where you want some pattern without the cutting of herringbone. |
| Herringbone | 10% or more | Driveways. The angled interlock resists braking and turning forces. |
These are working figures, not rules. A patio full of curves and odd angles will beat all of them, and a plain rectangle laid at 45° to the house will beat them too, because every edge becomes a cut.
How thick the layers have to be
For block paving, Paving Expert puts the sub-base at "a minimum 100mm thick, but in exceptional circumstances could be reduced to 75mm for paths or patios on good ground", and the laying course at "a bed of coarse, grit sand, 25-40mm". In US terms that is a 4 in compacted base under a 1 in sand bed for foot traffic.
Vehicles change the answer. A driveway wants 6 in of compacted stone, more on soft or clay ground, and the thickness is what carries the load — a thicker sand bed will not make up for a thin base, it will just settle. Paving Expert's guide to laying flexible block paving covers the construction in detail, and the Interlocking Concrete Pavement Institute publishes the North American technical guidance for the same work.
The fall nobody builds in
A paved surface has to shed water, and the slope has to be built into the subgrade, not created with a thicker sand bed. Paving Expert is specific: the finished paving needs "a fall (slope) of not less than 1:80 to ensure adequate drainage of surface water". That is about an inch and a half over ten feet — enough to see if you look along it, not enough to feel underfoot.
If you try to take out a dip with extra sand instead, the pavers above it will follow the dip as the sand compacts and migrates. The laying course is for bedding, not for levelling.
Edge restraint is not optional
Interlocking pavers only lock together while something stops the outer courses from moving outward. Without a restrained edge — a concrete haunch, a kerb, or a proprietary plastic or metal restraint pinned into the base — the surface creeps outward under load and the joints open up, usually within a season or two, and no amount of re-sanding fixes it.
Ordering
- Pavers are sold by the piece, by the square metre, and by the pallet depending on the supplier. Compare all three before you decide which is cheaper.
- Stone and sand are sold by weight or by volume depending on the yard. Check which, because the same number means very different amounts.
- Whole pallets are usually cheaper per unit than part pallets. If your count is 903 and a pallet is 900, buy the pallet and a small top-up rather than 903 loose.
- Order the base and sand with the pavers, not after. Nothing stops a job faster than a compacted base with nothing to put on it.
- If you are working out the base layer on its own, or pricing it separately, the gravel calculator handles depth-to-weight for a range of stone types.
FAQ
How many pavers do I need for a 10×10 patio?
About 452 of the standard 4 × 8 in units laid in a running bond. Ten by ten feet is 100 square feet, which takes 430 pavers before waste, and 5% on top covers the cuts. A herringbone pattern over the same area needs roughly 473, because the cutting waste is double.
How much sub-base do I need under pavers?
Four inches of compacted stone under 100 square feet is 1.23 cubic yards, which is about 1.75 tons. A driveway needs six inches: 1.85 cubic yards, roughly 2.6 tons over the same area.
What is the best paver pattern for a driveway?
Herringbone, laid at 45° or 90° to the direction of travel. The angled interlock resists the braking and turning forces a car puts into the surface, which running bond does not. The trade-off is cutting waste: budget around 10% rather than 5%.
How thick should the sand bed be under pavers?
About an inch, uncompacted, over a level base — Paving Expert gives 25–40 mm for block paving. It is a laying course, not a levelling layer. Use it to take out dips and the pavers will settle into those dips as the sand compacts.
Do I need edge restraint?
Yes, always. Pavers interlock with each other but nothing stops the outer courses from spreading outward unless you restrain them. Without it the surface creeps and the joints open up, usually within a season or two.
Can I lay pavers over an existing concrete slab?
You can, if the slab is sound and still drains somewhere. The units bed on about an inch of sand straight onto the concrete. The catch is height: the surface ends up higher by the paver thickness plus the sand, roughly 3⅜ in for a 60 mm unit on a 25 mm bed, which affects door thresholds and where the paving meets the house. Cracks in the old slab will eventually show through the joints above them.
Do I have to compact the sub-base?
Yes, and in layers rather than all at once. A plate compactor only works properly through 2–3 in at a time, so a 4 in patio base is two lifts and a 6 in driveway base is three. Tipping in the full depth and compacting once leaves the bottom loose, and that is where settlement starts.