GetTallyKit › roofcost
Your roof is larger than your floor plan. Enter the footprint and the pitch to get the real roof area, the squares, and what replacing it costs.
US dollars. A roofing square is 100 square feet of finished roof, which is how roofers quote. Footprint is the area the house covers, not the roof area — the pitch handles that.
| Line | Squares | Rate | Subtotal |
|---|
Your roof is not the size of your floor plan
Ask most homeowners how big their roof is and they will quote the square footage of the house. Those are two different numbers, and the gap is the pitch. A roof is a sloped plane, so every square foot of floor plan carries more than a square foot of roofing, and the steeper the roof the wider that gap gets.
flat ceiling area ───────────── 1,500 sq ft
4/12 pitch ───────────── 1,581 sq ft (+5%)
6/12 pitch ───────────── 1,677 sq ft (+12%)
8/12 pitch ───────────── 1,803 sq ft (+20%)
12/12 pitch ───────────── 2,121 sq ft (+41%)
On a 12/12 roof that is a 41 percent error in material quantity before anyone has quoted a price. It is also why two estimates for the same house can differ by thousands of dollars without either contractor being dishonest.
Why roofers talk in squares
A roofing square is 100 square feet of finished roof, and it is the unit that shingles are sold, delivered and priced in. A "30 square roof" is 3,000 square feet. Once you know your squares, most of the quote becomes checkable: shingles per square, underlayment per square, labour per square, disposal per square.
Typical installed prices per square in the US run about $400 for 3-tab asphalt, $500 for architectural, and $900 or more for metal. A 1,500 square foot footprint at a standard 6/12 pitch is about 16.8 squares, which puts asphalt replacement around $6,700 to $8,400 before tear-off and permits. For a second read on current ranges by roof size and shingle type, This Old House publishes a cost guide that tracks the same ballpark.
What actually moves the price
Pitch. It affects quantity and labour at the same time. A steeper roof needs more material per square foot of floor, and it takes longer and safer to walk on.
Layers. One layer of old shingles is routine. Two layers means more weight to strip, more disposal, and usually a look at the decking underneath. Some jurisdictions limit how many layers a roof may carry, which forces a tear-off even when the homeowner would rather shingle over.
The shape, not the size. Valleys, dormers, chimneys and skylights all add cutting, flashing and time. Two roofs with identical square counts can differ by 30 percent on labour because one is a simple gable and the other has six penetrations.
Decking. Soft or rotted sheathing is found after tear-off and is billed as an extra. It is the most common reason a final invoice exceeds the quote.
Where the money goes
For asphalt, materials and labour land close to even, with labour taking the larger share on complex roofs and the smaller share on simple ones. Metal flips that: the material is the expensive part, and it is usually priced by the linear foot of panel rather than by the square, which makes per-square comparisons misleading.
If the roof is one line of a bigger job
Roofing rarely happens alone. If you are costing a whole renovation, the other cost calculators here work the same way, materials and labour priced separately so you can see what the labour is worth: what a repaint costs and what a fence run costs. For quantities rather than money, the home and garden calculators cover the material side.
What this calculator leaves out
Permits, which commonly run a few hundred dollars. Decking repair. Gutter replacement, often sensible to do at the same time since the roofers are already up there. And ventilation upgrades, which are cheap during a replacement and expensive afterwards.
Get the quote itemised by square, with tear-off, disposal, permits and decking listed separately. When three bids arrive, the difference is almost never the shingle price; it is what each one included.
FAQ
How many squares is my roof?
Multiply the footprint by the pitch factor, then divide by 100. The pitch factor is the square root of 1 plus (rise divided by 12) squared: 4/12 gives 1.054, 6/12 gives 1.118, 8/12 gives 1.202, 12/12 gives 1.414. A 1,500 square foot footprint at 6/12 is about 1,677 square feet of roof, or 16.8 squares.
Why is my roof bigger than my house?
Because it is sloped. The floor plan is a flat projection; the roof is the actual surface, and any sloped surface covers more area than the flat area underneath it. The gap grows with pitch, from about 5 percent at 4/12 to about 41 percent at 12/12.
What does a roofing square cost installed?
Roughly $400 per square for 3-tab asphalt, $500 for architectural asphalt, and $900 or more for metal, as national mid-market figures. A roofing square is 100 square feet. These are planning numbers, not quotes; regional labour and roof complexity move them a lot.
Should I tear off the old roof or shingle over it?
Tear-off is the better answer in most cases: it lets the decking be inspected, avoids trapping moisture, and resets the layer count. Shingling over is cheaper short term but many jurisdictions cap a roof at two layers, so you may be forcing a full tear-off next time. It also hides problems you would rather find now.
How much does a new roof cost on a 1,500 square foot house?
For asphalt shingles at a standard pitch with one layer to remove, most US projects land between $7,000 and $12,000 depending on region, pitch and complexity. Footprint size alone does not determine it: a simple gable and a roof with dormers and valleys can differ by a third at the same square count.
Does a steeper roof really cost more?
Yes, twice over. It needs more material because the surface area is larger, and it takes longer because crews work slower with fall protection and cannot walk the surface freely. Above about 8/12 the labour premium becomes obvious in the quote.
How long does a roof replacement take?
A typical single-family asphalt replacement takes two to four days depending on size, pitch and weather. Tear-off adds time at the front, and any decking repair found underneath adds it in the middle. Metal roofs usually take longer than asphalt on a comparable house.
Related calculators
Figures are estimates for planning. Local prices, bag yields and mix designs vary by supplier and region, so confirm with your ready-mix plant or builders merchant before ordering. Nothing you type is uploaded — every calculation runs in your browser.