GetTallyKit › precast building
Quotes come per square foot of floor, but the plant sells wall face, planks and crane time. Enter the plan and see what the shell actually lands at.
US dollars, budget level. Panel price is the plant gate; freight, crane, joints and the slab are added on top, which is where a builder quote and a plant quote usually stop agreeing.
| Line | Quantity | Cost |
|---|
Quoted by floor area, priced by wall area
A precast building quote usually arrives as one number per square foot of floor, which makes it easy to compare against steel or timber. The trouble is that the plant does not sell floor. It sells wall face, roof planks and the crane time to put them up. Those two areas move in opposite directions as the plan changes.
Take a 1,200 sq ft building. At 30 by 40 ft the perimeter is 140 ft, so at a 10 ft eave the wall face is 1,400 sq ft before openings. Reshape the same floor into 24 by 50 ft and the perimeter grows to 148 ft, adding 80 sq ft of wall without adding a single usable foot inside. Raise the eave from 10 to 14 ft and the wall face climbs to 1,960 sq ft while the floor stays exactly where it was.
That is why two quotes for the same floor area can differ by 15 percent and both be correct. Before you compare, compare the wall face. The calculator above prints the ratio, and anything above about 1.0 means you are buying more wall than floor.
Panel width is a freight decision
A standard flatbed carries 8.5 ft wide without anything special. Go past that and every load needs an oversize permit, an escort in most states, and often a night-time only movement window. In practice that adds roughly 1,200 to 1,800 dollars per trip, and it is charged per trip, so it multiplies with the truck count rather than the panel count.
A 10 ft wide panel is often chosen because it means fewer joints and faster erection. That is a real saving. But it is a saving on the crane and the sealant, paid for on the highway, and the two only balance out on large orders where the truck count is already low. On a small building, staying at or under 8.5 ft is usually the cheaper call.
You cannot buy half a truck
Freight is quoted per load, not per panel. A 48 ft flatbed will take roughly 1,300 to 1,500 sq ft of wall panel before it runs out of legal weight, so a building with 2,400 sq ft of panel needs two loads whether the second one is full or not. The fixed part of each load, a truck, a driver and a half day, does not shrink because the load is light.
This is the single most common reason a small precast building comes out more expensive per square foot than a large one, and it has nothing to do with concrete. If your order lands just over a truck boundary, it is worth asking whether a slightly different panel module would bring it back under.
Narrower panels cost more, not less
It feels like splitting a wall into more, smaller panels should be cheaper, since each piece is lighter and easier to handle. The opposite is true once you count the joints. Every vertical joint needs a weld plate, grout and a run of sealant down the full height of the wall, and those are priced per joint and per linear foot.
A 140 ft perimeter at 8 ft panel width gives 18 panels and 180 linear ft of vertical seam. Push the panel width down to 5 ft and you get 28 panels, 280 linear ft of seam, and more crane picks for the same wall. Fewer, wider panels is almost always the cheaper wall, right up to the point where the permit and the crane capacity take it back.
Crane days, not crane hours
Erection is sold by the day. A crane with an operator, plus the transport of the crane and its counterweights, runs about 2,800 dollars a day in most US markets, and the minimum is one day regardless of whether the lift takes forty minutes. Twenty-five panels is a comfortable day on open ground. A tight site where the crane can only reach one elevation, or a street that has to be closed for the lift, turns the same twenty-five panels into two or three days.
The cheap fix is sequencing. Panels loaded in the order they will be erected means the crane never waits for a truck to be unloaded and re-sorted, which is where half of a wasted crane day usually goes.
There is a delivery radius, and it is not negotiable
Precast is a heavy, low-value-per-pound product, which puts a hard limit on how far it travels before freight eats the unit price advantage. In practice that radius is around 250 to 300 miles, and inside it the price map is uneven. Plants cluster near cities, so a build 40 miles from a plant and a build 200 miles from the nearest one can face freight bills that differ by a factor of five for identical panels.
Crossing a state line makes it worse. Axle weight limits, escort rules and permit reciprocity all change at the border, so a load that is legal in one state may need a second permit and a different route in the next. If the nearest plant is out of state, ask them for a quote that separates freight from panel price, then price the same panels from a plant that is further but in-state. The number that matters is the landed one.
This is also why the answer to "where should I build" is often "near a plant". Land in a county with two precast yards is worth more per acre for exactly this reason, and no amount of good design compensates for a 400 mile haul.
What this estimate leaves out
The figure covers the shell: wall panels, roof planks, freight, crane, joints, the slab and site prep. It does not cover mechanical, electrical, plumbing, doors and windows, interior finishes, insulation beyond what is cast into the panel, or the connection design that a structural engineer has to stamp.
Excavation and engineered footings are also missing, and on a bad site they are not small. A precast building is light for its size but it is still point-loaded at the panel bearings, so the footing is designed rather than assumed. Budget an engineer's fee before you treat any per-square-foot number as final.
FAQ
Is a precast building cheaper than steel frame?
On the shell alone, usually not. Steel is typically 10 to 25 percent less per square foot for the same span. Precast closes the gap through speed, durability and insurance, and overtakes steel on buildings that need fire resistance, storm shelter rating or a very long service life. Compare landed shell cost, not the brochure rate.
Why is the wall area bigger than the floor area?
Because a wall wraps around the perimeter and a floor fills the inside. A 30 by 40 ft building has 1,200 sq ft of floor but a 140 ft perimeter, and at a 10 ft eave that is 1,400 sq ft of wall face before any openings are cut. Taller eaves and longer, narrower plans push the ratio further up.
How wide can a precast panel be before it needs a permit?
8.5 ft is the usual limit for a standard flatbed without an oversize permit. Above that you need permits, often an escort vehicle, and in many states a restricted travel window. Expect 1,200 to 1,800 dollars extra per trip once you cross the line.
How many square feet of panel fit on one truck?
About 1,300 to 1,500 sq ft on a 48 ft flatbed, limited by weight more often than by space. Panels run 40 to 80 pounds per square foot, so an 8 inch sandwich panel hits legal load limits before the deck is full.
Can the crane lift panels over a fence or power line?
Over a fence, usually yes, with enough boom and a clear swing radius. Over live power lines, no, and the utility has to be involved. That single constraint can force a second crane position and add a full day, so it is worth checking before the panels are cast.
Does the price include the slab?
Not unless it is written into the quote. Slabs are usually a separate trade, and a precast building needs the slab cured and within tolerance before erection, because the panels bear on it. The calculator lets you include or exclude it so you can match whatever your builder has already priced.
What is the smallest building worth doing in precast?
Around 400 to 600 sq ft, and only if a plant is close. Below that, the truck and crane minimums dominate and a timber or block structure wins on cost. The exception is a building that has to be bullet resistant, fire rated or relocatable, where precast is chosen for reasons other than price.
Related calculators
Figures are estimates for planning. Local prices, bag yields and mix designs vary by supplier and region, so confirm with your ready-mix plant or builders merchant before ordering. Nothing you type is uploaded — every calculation runs in your browser.