Most cost estimates stop at the price of concrete, which is usually a third of the bill. This breaks the job into materials, formwork, reinforcement, labour and the extras people forget, then gives you a cost per square foot you can compare against a quote.
About $0.35 for mesh, $0.75 for a rebar grid, 0 for none.
Contractor costs
Set to 0 if nothing has to come out first.
A flat fee where the truck cannot reach the pour.
Doing it yourself
Mixer, plate compactor, float, saw, plus incidentals.
Why does the same slab cost twice as much in two quotes?
Because the concrete is not the expensive part. On a typical residential slab the material is roughly a quarter to a third of the bill. Everything else — getting the ground ready, holding the edge, finishing the surface, taking the old one away — is the remaining two-thirds, and that is where the two quotes diverge.
| Item | Share of total | What drives it |
|---|---|---|
| Ready-mix concrete | 25 – 35% | Volume, local plant price, short load fee |
| Labour and finishing | 30 – 45% | Crew size, finish type, site difficulty |
| Excavation and base | 10 – 20% | How much has to come out and be compacted |
| Formwork | 5 – 10% | Perimeter length, curves, reusable forms |
| Reinforcement | 3 – 8% | Mesh versus a rebar grid |
| Extras | 0 – 15% | Pump, demolition, permits, sealer |
That split explains the thing that surprises most people: a thicker slab does not cost proportionally more. Going from 4 to 6 inches puts 50% more concrete in the ground, but the labour, base and formwork barely move — so the total rises roughly 12–18% while the slab becomes dramatically more durable. Thickness is one of the best value upgrades on the entire job.
Reading a quote properly
- Check whether the base is included, and to what depth. This is the line most often left vague, and the one that decides whether the slab cracks.
- Check the finish. Broom, trowelled and stamped are different labour quantities written as one word.
- Check who removes the old surface and where it goes. Tipping is not free, and it is sometimes priced separately.
- Check access. If the truck cannot reach the forms you need a pump, and that is a real line item, not a detail.
- Check whether thickness is stated. A quote that says "concrete slab" without a thickness is not comparable to one that says "5 inch with mesh".
DIY or hire it out
Doing it yourself saves the labour line, which is genuine money. What it does not save is the concrete, and it adds tool hire, a longer schedule, and the risk of a pour that goes wrong. Concrete is unforgiving in a way few materials are — it arrives wet, it sets on a clock, and the remedy for a mistake is a jackhammer rather than a repaint.
- DIY makes sense up to roughly 300–400 square feet on a simple rectangle with good access, where you can get help for the pour itself.
- Hire it out for anything over about 600 square feet, anything with poor access that needs a pump, and anything where the finish is visible and matters.
- Hire the finishing even if you do the prep. A common middle path: you do the excavation, base and forms, and pay a crew only to place and finish. That is where the skill actually sits.
Costs that get forgotten
- Short load fees. Ordering under a truck's minimum can add $50–$150 as a flat surcharge. Sometimes the extra half yard is cheaper than the fee.
- Overtime and standby. Ready-mix is billed partly by the clock. If the site is not ready when the truck arrives, the waiting time is yours.
- Access. A pump runs $300–$800 where the truck cannot reach the forms, and barrowing by hand adds hours.
- Curing and sealing. Cheap, and skipped often enough to be worth listing.
- Spoil removal. Excavated soil and demolished concrete have to go somewhere, and tipping is not free.
The percentages above reflect US residential practice as described by the Portland Cement Association and the American Concrete Institute. The structure of the split holds in the UK, Ireland and Australia; the absolute numbers move with local labour rates and material prices.
FAQ
How much does a concrete slab cost per square foot?
A straightforward residential slab runs $6 to $10 per square foot installed, including materials, labour and basic prep. Doing it yourself drops that to roughly $3 to $5 in materials and hire. Decorative finishes or difficult access push it above $12.
Why is my quote so much higher than the cost of the concrete?
Because concrete is typically only a quarter to a third of the total. Labour and finishing are usually the largest single line, and excavation, base preparation, formwork and reinforcement make up most of the rest.
Is it cheaper to do concrete work myself?
Up to about 300 to 400 square feet on a simple shape, yes, and the saving is mainly the labour line. Above that, or where access is hard or the finish matters, hiring is usually better value once you count tool hire and the risk of a pour going wrong.
Does a thicker slab cost proportionally more?
No. Going from 4 to 6 inches puts 50 percent more concrete in the ground, but labour, formwork and base preparation are almost unchanged, so the total rises by roughly 12 to 18 percent. That makes extra thickness one of the cheapest durability upgrades available.
What is a short load fee?
A flat surcharge, typically $50 to $150, that plants add when an order is below their minimum load. On small jobs it can be cheaper to order slightly more concrete than to pay the fee — worth checking every time you compare prices.
How accurate is an online concrete cost estimate?
Good enough to sanity check a quote or set a budget, usually within 15 to 20 percent. Local labour rates, site access and ground conditions move the real number more than any formula can anticipate, so treat the result as a range, not a price.
What is not included in a typical quote?
Commonly: demolition of the old surface, spoil removal, a pump if the truck cannot reach the forms, sealing, and permits. Ask which of these are in scope before comparing two prices — a quote that includes demolition is not comparable to one that does not.
How much does a pump add?
Typically $300 to $800, depending on distance and how long it is on site. Barrowing by hand is the alternative and is fine up to a point, but it adds hours to a job that is already running against a setting clock.
Does the finish change the price much?
Yes, and it is one of the biggest swings. A broom finish is the cheapest and quickest; a smooth trowelled finish takes more passes; stamped or coloured work is a different trade in terms of labour. The concrete underneath is identical.
When is the best time of year to pour?
Mild weather — roughly 50 to 80°F. Cold slows curing and risks freezing before the concrete gains strength; hot weather shortens working time and increases plastic shrinkage cracking. Very hot or very cold days usually cost more, not less.
Can I save money by skimping on the base?
It is the worst place to save. Base preparation is 10 to 20 percent of the bill and is the single biggest determinant of whether the slab cracks. A thicker slab on a bad base fails before a thinner slab on a properly compacted one.