UK Ballast & Cement Calculator

GetTallyKit › UK Ballast & Cement

For mixing concrete on site with all-in ballast. Enter the size of the slab, footing or trench and this gives you the ballast in tonnes or bulk bags, the number of 25 kg cement bags, and the water — for a 1:4, 1:5 or 1:6 mix.

Ballast
— tonnes
—
Cement
— bags
—
Water
— litres
—
Materials cost
—
—

If you are mixing concrete in the UK, the ratio has two numbers, not three

That trips up anyone who learned the 1:2:4 cement-sand-aggregate form. All-in ballast is sand and coarse aggregate already blended together, so the ratio is written cement : ballast. One number for the cement, one for the bag of ballast.

The trade-off is the same as anywhere: more cement means a stronger, more expensive mix. Leaner mixes use less cement and more ballast, and are fine where nothing structural sits on top.

MixRoughlyBallast CementWaterTypical use
1:4C251.60 t13 bags179 LStructural slabs, heavy duty
1:5C201.75 t11 bags151 LGeneral slabs, paths, driveways
1:6C151.85 t9 bags124 LFoundations, footings, kerb bedding

Cement bags are 25 kg. Water is figured at a 0.55 water-to-cement ratio, which is workable by hand. Every litre beyond that makes the mix easier to place and weaker when cured — too much water is the most common fault in site-mixed concrete.

Bulk bag or 25 kg sacks

A bulk bag — jumbo bag, tonne bag, sometimes holding 800 kg rather than a tonne — is far cheaper per tonne than bagged ballast. The catch is purely handling: it arrives on a pallet, it is moved by forklift or a crane lorry, and once it is on the ground you shift it by wheelbarrow.

  • Under about 0.5 m³, bagged usually makes sense. You can carry it, and you are not left storing a tonne of material.
  • Above about 1 m³, bulk bags win on price, and delivery is often free above a minimum order.
  • Check access before ordering. A bulk bag needs a hard surface to be dropped onto and somewhere to sit. If the only route is through the house, order bags.

Volumetric, ready-mix, or mix it yourself

Ready-mix — and in the UK, volumetric trucks that mix on site — starts to make sense above about 1 cubic metre, and is clearly better above 2 or 3. You get a consistent mix, no storage, no wheelbarrow chain, and you are not racing the setting time of a mixer that holds a fraction of what you need.

Below that, mixing on site is genuinely cheaper, and for a few fence posts or a small shed base it is the only practical option. The real tipping point is not the money. It is how much of your weekend the wheelbarrow takes.

Three things that ruin site-mixed concrete

  • Damp ballast. Ballast left uncovered holds water, and that water counts toward your mix without you adding any. Keep it covered, and add less water on a wet day.
  • Adding water at the end. Once the mix starts to go off, re-tempering it with more water weakens it substantially. Mix smaller batches instead.
  • Guessing the ratio with a shovel. Use a bucket or a gauge box and fill it the same way every time. Shovel counts vary by a surprising amount, and the ratio is what sets the strength.

Mix proportions follow common UK site practice; the British Ready-Mixed Concrete Association and the The Concrete Society publish fuller guidance on specified and designed mixes. Where a structural engineer has named a grade, use that instead of a nominal ratio.

FAQ

How much ballast and cement for 1 cubic metre of concrete?

For a general purpose 1:5 mix, about 1.75 tonnes of ballast and 11 bags of 25 kg cement, plus roughly 150 litres of water. That is a little over two 800 kg bulk bags of ballast.

What is the ratio of cement to ballast?

1:5 by volume is the standard general purpose mix and gives roughly C20 concrete. Use 1:4 where you want more strength, and 1:6 for foundations, footings and bedding where the load is lower.

How many 25 kg bags of cement make a cubic metre?

About 11 for a 1:5 mix, 13 for 1:4 and 9 for 1:6. A 25 kg bag of cement is roughly 0.017 cubic metres by volume once it is loose in the mixer.

What is all-in ballast?

Sand and coarse aggregate pre-blended in the right proportion. It is why the ratio is written as two numbers instead of three. You lose the ability to tune the sand content, but for general work it is convenient and the result is fine.

Can I use all-in ballast instead of sand and aggregate?

Yes, and for most domestic work it is the normal choice. The trade-off is control: a separate sand and aggregate mix lets you adjust the sand content, which matters for some finishes and for very lean or very rich mixes.

How much water do I add to a 1:5 mix?

About 150 litres per cubic metre, which is a water-to-cement ratio of roughly 0.55. Add it gradually rather than all at once: the mix should hold together when squeezed, not slump. Every extra litre costs strength.

What is the difference between C20 and C25 concrete?

Characteristic compressive strength at 28 days — 20 and 25 N/mm² respectively. C20 corresponds roughly to a 1:5 ballast mix and covers general slabs, paths and driveways; C25 is closer to 1:4 and is used for structural slabs and heavier duty.

How many bulk bags of ballast do I need?

For a 1:5 mix at 1 cubic metre you need about 1.75 tonnes, which is a little over two 800 kg bulk bags. Check what your supplier actually fills them to — 'tonne bag' is a loose term and 800 kg is common.

Is it cheaper to mix concrete myself in the UK?

Below roughly 1 cubic metre, yes, and it is the only realistic option for small jobs like fence posts. Above 2 or 3 cubic metres ready-mix is better value once you count the labour, and it gives a far more consistent result.

Should I order a bulk bag or bagged ballast?

Under about 0.5 cubic metres, bagged — you can carry it and are not left storing a tonne. Above about 1 cubic metre, bulk bags win on price. Check access first: a bulk bag needs a hard surface to be dropped on and somewhere to sit.

Can I use a 1:6 mix for a shed base?

Yes. 1:6 is roughly C15 and is the usual choice for foundations, footings and kerb bedding, which is what a shed base is. If the shed is large or will carry something heavy, step up to 1:5 for very little extra cost.

How long does site-mixed concrete take to set?

Workable for roughly 30 minutes in mild weather, less when it is hot or in direct sun. It will take foot traffic after a day or two and full strength at 28 days. Do not add water to a mix that has started to stiffen — mix a smaller batch instead.

Related calculators

Figures are estimates for planning. Local prices, bag yields and mix designs vary by supplier and region, so confirm with your ready-mix plant or builders merchant before ordering. Nothing you type is uploaded — every calculation runs in your browser.